Quote Check
Spec in (class, kVA or kW or sections, voltage, region), price band and published lead time out, from the Bid-Tab Price Book and the Lead-Time Monitor, with n and date.
Method
Bands are unit prices from public procurement awards in the Public Bid-Tab Price Book, grouped by class, size range, voltage and region. A cell publishes only when it holds five or more awards; until then the tool says “insufficient public awards yet” and points to the Equipment Price Benchmark contribution form rather than printing a number. Lead times are the same published figures the Lead-Time-Adjusted Schedule uses. As of 2026-09-10 the award file is still being compiled, so every cell shows the contribute state.
Every input is mirrored to the URL so a scenario can be shared as a link.
Default assumptions come from the Public Bid-Tab Price Book. Pro subscribers can save inputs; Institutional seats get the underlying series.
Articles that use this calculator
ElectricalDraft
Modular Is Not Cheaper: A 50 MW Prefab Electrical Room, Line by Line
ProcurementDraft
The Recommended Spares List Is Where the Margin Hides
ElectricalDraft
800 VDC Will Strand Your White-Space Frame Agreement
ProcurementDraft
Liquidated Damages at 0.5% a Week: Why Caps Sit at the Vendor's Margin
ProcurementDraft
How to Write an RFQ for Capital Equipment in 2026
CoolingDraft
The R-454B Summer: What the Refrigerant Switch Did to Chiller Prices
CoolingDraft
OFCI vs Design-Build: How Hyperscalers Buy Chillers and Colo Developers Do Not
ProcurementDraft
Grainger's 2017 Confession: The Year a Distributor Admitted Its List Prices Were Fiction
ProcurementDraft
Reading a Switchgear Quote: The Eleven Line Items That Hide the Schedule
MachineryDraft
1,250 Hours: Reading BMW's Humanoid Pilot as a Buyer
MachineryDraft
The $306k Machine: A Record Half-Year With Fewer Units
MachineryDraft
From 36 Weeks to Stock: The ControlLogix Lead-Time Cycle
MachineryDraft
A Robot Costs $61k. The Cell Costs $150k
PowerDraft
The $60 Million Deposit: How Equipment Slots Became Datacenter Currency
ProcurementDraft
Who Gets the IEEPA Refund
CoolingDraft
Compressed Air Is 10% of Your Factory's Power Bill
CoolingDraft
Five Majors Bought Their Way Into Liquid Cooling. Here Is the Price List
PowerDraft
Recips vs Turbines vs Fuel Cells for a 100 MW Bridge
ElectricalDraft
The 2 MW Plant Service Upgrade Nobody Budgets Right
CoolingDraft
Chillers Are the 60-Week Problem
MachineryDraft
What a Haas VF-2 Really Costs in 2026
ProcurementDraft
What 2,439 Public Change Orders Show About Electrical and Mechanical Contractors
ProcurementDraft
Copper at $6.77: How a 50% Tariff Shows Up in a 200-Amp Panel
ProcurementDraft
The Used and Refurbished Market Nobody Indexes
MachineryDraft
Japan Is Eating the US Capex Boom
MachineryDraft
Who Bought the EV Plants' Machines
ElectricalDraft
When a Megapack Beats a Static UPS
ElectricalDraft
The OEM Disclosure Scorecard: Who Tells Buyers Anything
ProcurementDraft
Rockwell's 250 Basis Points: How Tariffs Show Up in Your PLC Quote
ProcurementDraft
Datacenter Construction Is Eating Your Electricians
ElectricalDraft
Why Your Switchgear Costs 50% More Than in 2021
PowerDraft
The 30% Fuel-Cell ITC Is the Last Federal Subsidy for On-Site Power
ElectricalDraft
Transformer Lead Times Hit 143 Weeks: Who Gets Delivered First
ProcurementDraft
Quote Check: What Your Switchgear Quote Should Have Said
ElectricalDraft
One Steel Mill Gates Every US Transformer
MachineryDraft
MES Is a Consulting Product
ProcurementDraft
Tariff Bill of Materials: What Sections 232 and 301 Add to a UPS, a Lineup, a Genset and a Megapack
ProcurementDraft
The Copper and Wire Price Sheet, Weekly
ProcurementDraft
The $2,850 Report That Says Nothing
MachineryDraft
Building the Missing Index: Realized Auction Prices for Used CNC Machines
ProcurementDraft
Introducing the Public Bid-Tab Price Book
ElectricalDraft
Cummins and Caterpillar Are Sold Out Through 2028
ProcurementDraft
The 171-Day Capex Lead Time: ISM's Most Ignored Table
ElectricalDraft
Book-to-Bill League Table, Q2 2026: Every Electrical OEM
ElectricalDraft