Low-voltage switchgear (LVDO), made to order. Source: Schneider Electric Lead Times Guide, September 2026 edition, published 2 September 2026. Eleven classes tracked; class detail is Pro. Sep 2026.

50 weeks, LV switchgear, published lead time, Schneider Electric Lead Times Guide, September 2026 edition. Monthly, first business day, after the Schneider guide (about the 2nd) and the M3 release.

Open the Lead-Time Monitor

Lead articleProcurementDraft

Tariffs, September 2026: The Actual Schedule for Machinery and Electrical Gear

IEEPA struck down Feb 20Section 122 ran to Jul 24Section 301 forced-labor tariffs on 60 economiesSection 232 metals at 50/25/15/10 with the Annex III 15% tier to Dec 2027.

Prannay Hebbar, September 9, 2026. 18 minute read, free to the paywall.

Models & Data

All models

50weeks

LV switchgear, published lead time, Schneider Electric Lead Times Guide, September 2026 edition

Lead-Time Monitor

Published lead times for eleven equipment classes compiled from OEM lead-time guides, Census M3 unfilled orders over shipments, ISM supplier deliveries and backlog disclosures in filings. Every cell carries its OEM and date.

Headline free Compiling data See the model

3.0x

Powell Industries book-to-bill, quarter ended June 30 2026: $934M of orders on $312M of revenue

Book-to-Bill League Table

Quarterly orders, backlog and book-to-bill for every listed electrical, power and cooling OEM, from filings only, with the read-across for buyers: which classes are getting longer and which are clearing.

Headline free Compiling data See the model

$9.8Mper MW

all-in datacenter build cost, Phoenix and Columbus, Turner & Townsend Data Centre Construction Cost Index 2025

Datacenter MEP Cost Table

Capex per MW by component on the Turner & Townsend and JLL baselines, air-cooled and liquid-cooled, with each line's lead time from the Lead-Time Monitor and the carrying cost of delay.

Pro Compiling data See the model

Copper and Wire Price Sheet

Latest copper price to $/ft of metal by NEC conductor size, with an escalation-clause calculator for bids.

Inputs Copper and aluminum $/lb (defaults from FRED, overwrite with the COMEX settlement); Conductor size (#4 AWG to 600 kcmil copper, 4/0 to 900 kcmil aluminum) and run length
Built on Public Bid-Tab Price Book. Live

Open the calculator

Genset TCO

Ten-year cost of a standby or prime generator set: diesel vs gas vs dual fuel, fuel, maintenance, permitting, Tier 4 aftertreatment, run hours.

Inputs Rating (kW), fuel (diesel, gas, dual) and Tier 4 Final toggle; Run hours per year and average load
Built on Public Bid-Tab Price Book. Live

Open the calculator

Subscribe

Every article is free to the paywall. Pro opens the rest, plus the vendor-level detail and the calculators with saved inputs. Desk and Institutional are for teams who want the alerts and the data itself.

  • Free$0
    • Every article to the paywall
    • Headline index numbers
    • Lead-Time Monitor headline
    • Large-Load Cost Table
    • Calculators with default inputs
    Get the free letter
  • Pro$40 a month, or $400 a year
    • Every article in full, with the archive
    • Lead-Time Monitor, every class, monthly
    • Bid-Tab Price Book bands by region
    • Large-Load Cost Table history
    • Calculators with saved inputs and exports
    • RFQ template library
    • 20% off for five or more seats
    Subscribe to Pro
  • InstitutionalQuote per firm, per year
    • Model workbooks and dashboards
    • Monitor history and API
    • Bid-Tab rows and API
    • Custom markets in the Large-Load Cost Table
    • Quarterly updates for a year, onboarding call
    • Analyst access and custom cuts
    Talk to us