ProcurementDraft
CalculatorLiveBuilt on Lead-Time Monitor
Lead-Time-Adjusted Schedule
PO dates and equipment classes in; critical path, temporary-power cost and energization month out, using the Monitor's current published lead times.
Method
Each line’s delivery window is its PO date plus the published lead time: Schneider Electric’s monthly Lead Times Guide (September 2026 edition, made-to-order weeks aggregated by product family), Wood Mackenzie’s Q2 2025 averages for power transformers, GSUs and MV switchgear as reported in its October 2025 note, the NRECA coalition’s “more than two years” for distribution transformers, and Terrapin Construction Group’s June 2026 reserved-slot bands for gensets. Ready = delivery plus your install weeks; the critical path is the latest high-end ready date and sets the energization month. Temporary-power cost is kW times your rental rate times the months between your target and that month. Rental rates and slippage beyond the quoted figure are not published and are not assumed; see the Lead-Time Monitor.
Every line and date is mirrored to the URL so a schedule can be shared as a link.
Default assumptions come from the Lead-Time Monitor. Pro subscribers can save inputs; Institutional seats get the underlying series.
Articles that use this calculator
ElectricalDraft
Modular Is Not Cheaper: A 50 MW Prefab Electrical Room, Line by Line
ProcurementDraft
The Recommended Spares List Is Where the Margin Hides
ElectricalDraft
800 VDC Will Strand Your White-Space Frame Agreement
PowerDraft
What 50 MW Costs in 15 US Markets
ProcurementDraft
Liquidated Damages at 0.5% a Week: Why Caps Sit at the Vendor's Margin
ProcurementDraft
How to Write an RFQ for Capital Equipment in 2026
PowerDraft
The 2% Funnel: 474 GW Requested, 9 GW Approved, 5.8 GW Energized in ERCOT
CoolingDraft
The R-454B Summer: What the Refrigerant Switch Did to Chiller Prices
CoolingDraft
OFCI vs Design-Build: How Hyperscalers Buy Chillers and Colo Developers Do Not
ProcurementDraft
Reading a Switchgear Quote: The Eleven Line Items That Hide the Schedule
MachineryDraft
The $306k Machine: A Record Half-Year With Fewer Units
MachineryDraft
From 36 Weeks to Stock: The ControlLogix Lead-Time Cycle
MachineryDraft
A Robot Costs $61k. The Cell Costs $150k
PowerDraft
The $60 Million Deposit: How Equipment Slots Became Datacenter Currency
ProcurementDraft
Who Gets the IEEPA Refund
PowerDraft
Behind the Meter, In Front of the Queue: 90 GW Announced, 2 GW Running
CoolingDraft
Compressed Air Is 10% of Your Factory's Power Bill
CoolingDraft
Five Majors Bought Their Way Into Liquid Cooling. Here Is the Price List
PowerDraft
Recips vs Turbines vs Fuel Cells for a 100 MW Bridge
ElectricalDraft
The 2 MW Plant Service Upgrade Nobody Budgets Right
CoolingDraft
Chillers Are the 60-Week Problem
ProcurementDraft
What 2,439 Public Change Orders Show About Electrical and Mechanical Contractors
ProcurementDraft
The Used and Refurbished Market Nobody Indexes
MachineryDraft
Japan Is Eating the US Capex Boom
MachineryDraft
Who Bought the EV Plants' Machines
ElectricalDraft
When a Megapack Beats a Static UPS
ElectricalDraft
The OEM Disclosure Scorecard: Who Tells Buyers Anything
ProcurementDraft
Rockwell's 250 Basis Points: How Tariffs Show Up in Your PLC Quote
PowerDraft
What Hyperscaler Nuclear PPAs Tell a Factory Negotiating a 15-Year Contract
ProcurementDraft
Datacenter Construction Is Eating Your Electricians
ElectricalDraft
Why Your Switchgear Costs 50% More Than in 2021
PowerDraft
The 30% Fuel-Cell ITC Is the Last Federal Subsidy for On-Site Power
ElectricalDraft
Vertiv Stopped Reporting Its Backlog. Here Is Our Estimate
ElectricalDraft
Transformer Lead Times Hit 143 Weeks: Who Gets Delivered First
ProcurementDraft
Quote Check: What Your Switchgear Quote Should Have Said
ElectricalDraft
One Steel Mill Gates Every US Transformer
MachineryDraft
MES Is a Consulting Product
ProcurementDraft
The Copper and Wire Price Sheet, Weekly
PowerDraft
Introducing the Large-Load Cost Table: 15 Markets Side by Side
ProcurementDraft
The $2,850 Report That Says Nothing
MachineryDraft
Building the Missing Index: Realized Auction Prices for Used CNC Machines
ProcurementDraft
Introducing the Public Bid-Tab Price Book
ElectricalDraft
Cummins and Caterpillar Are Sold Out Through 2028
ProcurementDraft
The 171-Day Capex Lead Time: ISM's Most Ignored Table
ElectricalDraft
Book-to-Bill League Table, Q2 2026: Every Electrical OEM
ElectricalDraft